

I have torrents have a great seed ratio and use mullvad
I have torrents have a great seed ratio and use mullvad
MistralAI look to be something along those lines
I have this at home and enjoy it. What will your work use it for?
Resource usage and storage would be the main things to look out for. Octi really does need ssds as hdds will slow it to a crawl, a good amount of ram is nice but not fully a requirement for home use
Parsec is pretty slick imo.
Without thinking into it I would have expected some more custom hardware, some on device AI acceleration happening. For one to go and purchase the device it should have been more than just an android app
Yes but that’s not ideal for a nervous flyer, or being in a window seat. It’s easier to just stand at the airport.
For me it’s the last chance to stand for a while. If I’m going to be sitting in a cramped seat for 2+ hours then you bet I’m going to be standing before hand. So the if I’m standing then I might as well be in line.
In the eyes of apple the screen on an iPhone would act as a security device as it contains the fingerprint sensor.
Guess I’m eating a lot of waffles from now on
This is sad to see. I have a hOn device which I recently connected to WiFi to see what features it would have. Sadly it had to connect to the internet to work so I didn’t play with it too much. I checked this plug-in out then and was hoping I could use it.
The whole 1gb is fine sounds like the old “nobody will need more than 64k of ram” is all
I’ve ran cat 6a in my home as when I’m sure to upgrade the devices I don’t want to have to redo all the cabling. I am looking at moving up from 1 Gb/s already as I can easily max out the connection when transferring data over the network, like a backup to a different system.
Hell, I’m pretty sure we have ISPs here in EU thag offer 2Gb WAN.
In terms of significant developments, more and more PCs are currently making the move to 2.5gb networking too
Well you can run 10 Gb/s over RJ45 these days too
I don’t know if they got the substation built, but last year they weren’t able to get enough power from the grid, so installed 14 generators (at 2.5mw each) to cover their needs
https://www.datacenterdynamics.com/en/news/elon-musks-xai-data-center-adding-to-memphis-air-quality-problems-campaign-group/